Slab marks Waraba milestone
Published 5:05am 17 August 2025
Words by Nick Crockford
A giant crane has lifted a 35-tonne slab into place at Waraba marking an important landmark in Unitywater’s Waste Water Project.
The huge slab, hosted up and positioned by a 350-tonne crane, sealed off a five-story underground wet well.
The new asset – and more than 4.5km of wastewater pipeline - will support 30,000 lots and up to 70,000 residents as Waraba (West Caboolture) develops over the next 40 years.
That is a wastewater network with capacity to process the equivalent of more than three million toilet flushes per day.
“The wet well is a 15-metre-deep storage chamber that helps manage the flow of wastewater to the pump station during peak periods,” Unitywater Principal Project Manager Victor Cabrera said said.
“Which means we can maintain a consistent downstream flow and break down any solids that might be present in the wastewater.
“From there, wastewater is pumped to the South Caboolture Wastewater Treatment Plant where it is cleaned and disinfected before being released into waterways as part of the urban water cycle.
“In peak wet weather events, the wet well will be able to process up to 381 litres of wastewater per second.”
KTJV Senior Project Engineer Josh Pearson said the wet well portion of the Waraba Wastewater Network project took significant planning.
“The placement of the rooftop slab to seal the wet well required significant technical expertise – from the type of crane needed, to the precise dimensions of its pour and placement,” he said.
“To allow maximum accuracy and efficiency, the delivery team poured the 35-tonne concrete slab directly adjacent to the wet well site and then used a 350-tonne crane to lift and place.
Construction began in May 2024 and is due for completion in late 2025.
Visit www.communityhub.unitywater.com/caboolture-west-wastewater-network
Related Stories
Teaming-up to help fight crime
Priority for 12,000 new homes
Making a splash at Grace Lutheran Primary School with two new pools
Top Stories
Making a splash at Grace Lutheran Primary School with two new pools
Work has started on an exciting addition to Grace Lutheran Primary School in Clontarf - a brand new, state-of-the-art aquatic precinct..
New look for historic station
Historic Shorncliffe station will reopen on July 27 after a major accessibility and heritage upgrade, with restored buildings, improved facilities and preserved railway history.
Ticket to $150,000 win
A Caboolture woman has won $150,000 on an Instant Scratch-Its ticket bought at Morayfield Shopping Centre, marking the region’s second major lottery win in just 24 hours.
Sam’s “super positive” for Games
Six Moreton Bay athletes are ready to shine at the 2026 Commonwealth Games in Glasgow, with swimming star Sam Short leading the region’s medal hopes in a packed competition schedule.
Ekka public holiday date for Moreton Bay
Moreton Bay residents can enjoy a long weekend on Monday, August 10, for the 2026 Ekka public holiday, with the Caboolture Family Fun Day offering free rides and family entertainment.
Popular Stories
Sidonie Newport joins Moreton Daily as Strategic Partner
One of the Redcliffe Peninsula's favourite café and bar destinations has joined Moreton Daily as a Strategic Partner, reinforcing its commitment to supporting community connection and local storytelling across the City of Moreton Bay.
Meet for free help to find jobs
The free Youth Job Meet returns to Strathpine, connecting young people with local employers, apprenticeships, training providers and on-the-spot job opportunities.
Appeal lodged in golf course battle
An appeal has been lodged against Moreton Bay City Council’s refusal of a proposed driving range at the former North Lakes Golf Course, with the dispute now heading to court.